The EU deforestation rules (EUDR), answered

Regulation (EU) 2023/1115 makes seven commodities and the products made from them deforestation-free, or they cannot enter or leave the Union. After two postponements the main obligations apply from 30 December 2026, and from 30 June 2027 for small operators established by the end of 2024. That makes it the rare rule you can still prepare for instead of scramble for; the work that takes longest, getting plot coordinates out of your suppliers, is the work you cannot start late.

Reference material, not legal advice. Every answer names the article and links to the consolidated text of the regulation on EUR-Lex. The main guide on this site covers product safety, chemicals, packaging and carbon; it does not cover this regulation, so nothing here points back to it.

The questions, with answers

Does it apply yet, and to whom first? 30 December 2026

Not yet. After a second postponement, agreed in December 2025, the main obligations apply from 30 December 2026. Operators that are natural persons or micro or small undertakings, and that were established as such by 31 December 2024, get until 30 June 2027; but not for products that were already covered by the old timber regulation, which fall on 30 December 2026 like everyone else.
Full answer — the grounds, the numbers, the pitfalls

The dates come from Article 38 as replaced by Regulation (EU) 2025/2650. Read them as three separate questions:

  • Which articles start? Articles 3 to 13, 16 to 24, 26, 31 and 32. That is the prohibition, the due diligence, the statements, the checks and the customs chapter; in practice, all of it.
  • Are you small, and since when? The later date is not for anyone who happens to be small in 2027. You must have been established as a natural person or as a micro or small undertaking within the meaning of Article 3(1) or 3(2) of Directive 2013/34/EU by 31 December 2024.
  • What are you shipping? A small operator dealing in timber and timber products that were covered by the Annex to Regulation (EU) No 995/2010 does not get the extra six months for those goods.

Two postponements in three years is a pattern, not a promise. Plan for December 2026 and treat any further delay as a windfall; the work that takes longest, collecting geolocation from every supplier, is the work you cannot start late.

Common mistake: reading the delay as a reason to wait. The obligation attaches to goods you place on the market from the date; the harvest and the plots behind those goods exist now, and the cut-off date of 31 December 2020 has not moved once.
Source: Regulation (EU) 2023/1115, Article 38, as replaced by Regulation (EU) 2025/2650, Article 1, point (25). Checked: 5 September 2026.

Which commodities and which products are covered? Annex I

Seven commodities: cattle, cocoa, coffee, oil palm, rubber, soya and wood. What the regulation actually bites on is the product list in Annex I, by HS code; a product is in scope if it contains, has been fed with, or has been made using one of the seven and its code is on that list. The full list is on this page, searchable.
Full answer — the grounds, the numbers, the pitfalls

Three things about the list that decide most cases:

  • Derived products are in. Leather, chocolate, palm-based fatty acids and glycerol, tyres and rubber gloves, furniture, plywood, pulp and paper. The commodity you never bought is in your product.
  • “ex” means part of the heading. An entry such as ex 4011 covers only the goods of that heading that contain or were made using the relevant commodity. Your classification alone does not settle it; the material does the rest.
  • The list moves. The Commission can amend Annex I by delegated act, and did: Regulation (EU) 2025/2650 deleted the printed-matter line (ex 49). Books and newspapers of paper are no longer a relevant product; the pulp and paper of chapters 47 and 48 they are printed on still are.

Recycled material is treated differently: goods produced entirely from material that has completed its lifecycle and would otherwise be discarded as waste are outside the regulation, except for by-products of a manufacturing process where that process involved material that was not waste.

Source: Regulation (EU) 2023/1115, Article 2, points (1) and (2), and Annex I, as amended by Regulation (EU) 2025/2650, Article 1, point (26); Article 34(1) on amending Annex I by delegated act. Checked: 5 September 2026.

Am I an operator, a downstream operator or a trader? this decides everything

The single most expensive question on this page, because it decides whether you file a due diligence statement at all. An operator places a relevant product on the market for the first time, or exports it. A downstream operator places or exports products made using relevant products that are already covered by a statement or a simplified declaration. A trader is anyone else in the chain who makes relevant products available on the market.
Full answer — the grounds, the numbers, the pitfalls

The three roles were rewritten in December 2025, and the rewrite is the substance of the simplification. What each one owes:

  • Operator. Exercises due diligence, submits a due diligence statement before placing on the market or exporting, keeps the records for five years, and carries responsibility for compliance with Article 3.
  • Downstream operator. Does not submit a statement. Must hold, and keep for five years, the identity and contact details of who supplied the goods and, where the supplier is an operator, the reference numbers or declaration identifiers; plus who they supplied on to. If they are not an SME they must also register in the information system before placing goods on the market.
  • Trader. Same information duty as a downstream operator, and the same registration duty when not an SME.

Two traps. First, importing into the Union makes you an operator, whatever you call yourself internally: the first making available on the Union market is the trigger. Second, buying inside the Union from an operator who has already filed does not automatically make you a downstream operator; that only holds where every relevant product you use is itself covered by a statement or a simplified declaration.

Common mistake: assuming a supplier's reference number ends the matter. If you are an operator and not an SME, you may refer to an existing statement only after ascertaining that the due diligence behind it was actually done, and you include its reference number in your own statement.
Source: Regulation (EU) 2023/1115, Article 2, points (15), (15a), (15b) and (17), Article 4 and Article 5, all as amended or replaced by Regulation (EU) 2025/2650, Article 1, points (1), (4) and (6). Checked: 5 September 2026.

What has to be true before the goods can move at all? Article 3

Three conditions, together. The products must be deforestation-free; they must have been produced in accordance with the relevant legislation of the country of production; and they must be covered by a due diligence statement or, for a micro or small primary operator, a simplified declaration. Fail any one and the goods may not be placed on the market, made available on it, or exported.
Full answer — the grounds, the numbers, the pitfalls

The second condition is the one importers underestimate. “Legal in the country of production” is not a general impression of legality; it reaches land use rights, environmental and forest law, third parties' rights, labour rights, human rights protected under international law, the principle of free, prior and informed consent, and tax, anti-corruption, trade and customs rules. You are expected to hold evidence on each of those that is relevant to your chain.

The first condition, deforestation-free, has a fixed date and no grandfathering: the commodity must have been produced on land that has not been subject to deforestation after 31 December 2020, and wood must have been harvested without inducing forest degradation after that date. A plot cleared in 2021 is disqualified, and everything from that plot with it.

Source: Regulation (EU) 2023/1115, Article 3 (as amended by Regulation (EU) 2025/2650, Article 1, point (2)), Article 2, points (13) and (40) and Article 9(1), point (h). Checked: 5 September 2026.

The geolocation requirement: what exactly do I need from suppliers? the long pole

Coordinates of every plot of land where the commodity was produced, with the date or time range of production; not an address, not a district, not a mill. Latitude and longitude to at least six decimal places. For plots over four hectares used for anything other than cattle, a polygon with enough points to describe the perimeter. For cattle, the geolocation refers to every establishment where the animals were kept.
Full answer — the grounds, the numbers, the pitfalls

This is the requirement that takes months, because it is not yours to produce. What to ask for, in the order suppliers can answer it:

  • Which plots fed this shipment. Not the whole estate; the plots behind the lot you bought. Mixing lots from many smallholders means many plots, and every one of them travels with the goods.
  • Point or polygon. Under four hectares a point is enough. Over four hectares it must be a polygon, and a point supplied for a large plot is a defective statement, not a rounding.
  • The production date or time range. The coordinates alone do not show that the harvest predates nothing; the date is part of the requirement.
  • Who is upstream and downstream. Name, postal address and email address of whoever supplied you and of whoever you supplied.

Any deforestation or forest degradation on a given plot disqualifies every commodity and product from that plot automatically. That is why suppliers resist handing over coordinates: it is checkable, from satellite, by anyone, for ever.

One relief was added in December 2025: a micro or small primary operator may give the postal address of the plots or of the establishment instead of the geolocation. That relief belongs to the producer at the start of the chain, not to you as importer.

Common mistake: collecting coordinates once, at onboarding. The geolocation belongs to the consignment, not to the supplier; a new harvest from a new plot is a new set of coordinates.
Source: Regulation (EU) 2023/1115, Article 9(1), points (c) to (f), Article 2, point (28) (geolocation, six decimals, polygons above four hectares) and Article 4a(5) as inserted by Regulation (EU) 2025/2650. Checked: 5 September 2026.

How and where do I submit the due diligence statement? the EU information system

Electronically, in the EU information system for the deforestation regulation, before the goods are placed on the market or exported. The system assigns a reference number for each statement. You keep a record of your statements for five years from the date of submission, and you pass the reference number down the chain.
Full answer — the grounds, the numbers, the pitfalls

The mechanics, in the order they happen:

  • Register in the information system. The system is the one set up under Article 33 and is run on the TRACES platform. Non-SME downstream operators and non-SME traders must register there too, even though they file no statement.
  • Submit the statement. It carries the information in Annex II: your name and address and, for goods entering or leaving the Union, your EORI number; the HS code, description and quantity; the country of production and the geolocation of all plots; the reference numbers of any statements you rely on; the declaration itself; and a signature.
  • Get the reference number to customs. It has to be available to the customs authorities before release for free circulation or export. In practice that means the number goes into your customs declaration, so your broker needs it before the vessel arrives, not after.
  • Keep the record for five years. Not the goods, the statement.

Submitting the statement is the moment you assume responsibility for the product's compliance with Article 3. It is a legal act, not an upload.

Source: Regulation (EU) 2023/1115, Article 4(2) and (3) and Article 33 (as amended by Regulation (EU) 2025/2650, Article 1, points (4) and (21)), Annex II, and Article 26(4) on making the reference number available to customs. Checked: 5 September 2026.

I am small. What do I actually get? less, but not nothing

Three different reliefs, and they are not the same thing. A later start date for small operators established by 31 December 2024. A one-time simplified declaration for micro or small primary operators in low-risk countries. And, for SME operators generally, no obligation to redo due diligence on parts that are already covered by a statement.
Full answer — the grounds, the numbers, the pitfalls

Which one applies to you depends on what you are, not on how you feel about your size:

  • Later date. Natural persons and micro or small undertakings under Directive 2013/34/EU, established as such by 31 December 2024: 30 June 2027 instead of 30 December 2026, except for goods covered by the old timber regulation.
  • Simplified regime. A micro or small primary operator, meaning one established in a country classified as low risk who places on the market what it grew, harvested, obtained or raised itself, submits a one-time simplified declaration in the information system and receives a declaration identifier. Risk assessment and risk mitigation do not apply to them, and postal addresses may replace geolocation.
  • No duplicate due diligence. An SME operator does not have to exercise due diligence again on parts of a product that were already covered by a statement; it gives the competent authority the reference number on request.

None of the three is available to an EU importer buying from a third country. The simplified regime in particular sits at the production end of the chain, not the import end; a European trading company is not a micro or small primary operator however small it is.

Source: Regulation (EU) 2023/1115, Article 2, point (15a), Article 4a and Article 4(8), as inserted or amended by Regulation (EU) 2025/2650, Article 1, points (1), (4) and (5); Article 38(3). Checked: 5 September 2026.

My country of origin is low risk. How much work does that save? simplified, not exempt

It removes the risk assessment and risk mitigation steps, not the statement and not the information. Where you have ascertained that all commodities were produced in low-risk countries, you do not have to carry out Articles 10 and 11; you still collect the Article 9 information, still submit the statement, and still have to show there is a negligible risk of circumvention or of mixing with goods of unknown or higher-risk origin.
Full answer — the grounds, the numbers, the pitfalls

The three tiers come from Article 29 and are set by implementing act. As adopted on 22 May 2025 the picture is lopsided: 140 countries low risk, four high risk (Belarus, the Democratic People's Republic of Korea, Myanmar and the Russian Federation), and every country not named is standard risk by default. That default is where most tropical origins sit.

The tier changes three things:

  • Your workload. Low risk allows the simplified due diligence of Article 13; standard and high risk do not.
  • Your odds of being checked. Member states must check at least 1 per cent of operators and non-SME downstream operators and traders for low-risk origin, 3 per cent for standard risk, and 9 per cent for high risk, plus 9 per cent of the quantity of each relevant product from high-risk origin.
  • Nothing about the cut-off date. A low-risk country does not make a plot cleared in 2021 acceptable.

The list is reviewed and updated, so check the current version before you build a process on it. A country moving from low to standard is a change in your obligations, not in your paperwork.

Source: Regulation (EU) 2023/1115, Articles 13, 16(8) to (11) (as replaced by Regulation (EU) 2025/2650, Article 1, point (10)) and 29; Commission Implementing Regulation (EU) 2025/1093 of 22 May 2025, Annex (140 low-risk and 4 high-risk countries; all others standard). Checked: 5 September 2026.

What happens at the border? the number, or no release

Relevant products entered for release for free circulation or for export are subject to controls under Chapter 5. The reference number of the due diligence statement must be available to customs before release. Where the competent authority has flagged a statement as requiring a check first, customs suspend the release.
Full answer — the grounds, the numbers, the pitfalls

What that means for a shipment, practically:

  • The number travels with the declaration. Unless it comes through the electronic interface between the customs systems and the information system, whoever lodges the declaration supplies it.
  • Customs check status, not substance. They look up the status the competent authority gave the statement. The substantive check is the competent authority's, on a risk basis.
  • Suspension is normal, not exceptional. A flagged statement stops the goods before they are released; the check happens with the container standing still.

This is why the sequence matters more than the paperwork: due diligence, then statement, then reference number, then customs declaration. Any order other than that one produces a shipment that cannot be released.

Source: Regulation (EU) 2023/1115, Article 26, in particular paragraphs 1, 3, 4, 6 and 7, with Articles 27 and 28 on cooperation between customs and competent authorities. Checked: 5 September 2026.

What happens if I get it wrong? at least 4 per cent of turnover

Member states set the penalties, but the regulation fixes the floor: for a legal person the maximum fine must be at least 4 per cent of total annual Union-wide turnover in the preceding financial year, and must be raised where necessary to exceed the economic benefit gained. Alongside that: confiscation of the products, confiscation of the revenues from them, exclusion from public procurement and public funding for up to twelve months, and a temporary ban on placing or exporting relevant products for serious or repeated infringements.
Full answer — the grounds, the numbers, the pitfalls

Two features make this heavier than the headline number:

  • It is turnover, not margin, and Union-wide. The calculation follows the aggregate turnover rules in Article 5(1) of Regulation (EC) No 139/2004, so a group's turnover, not the importing entity's.
  • Judgments are published. The Commission publishes a list of final judgments against legal persons, with the name, the date, a summary of the conduct and the penalty. Member states notify them within thirty days.

There is also a penalty that only bites the careful: a serious or repeated infringement can cost you the right to use the simplified due diligence of Article 13, which is the relief that made low-risk sourcing cheap in the first place.

Source: Regulation (EU) 2023/1115, Article 25, paragraphs 1 to 3. Checked: 5 September 2026.

I already comply with the old timber regulation. What happens to that? 995/2010 goes

Regulation (EU) No 995/2010, the EU Timber Regulation, is repealed with effect from 30 December 2026. It keeps applying until 31 December 2029 to timber and timber products produced before 29 June 2023 and placed on the market from 30 December 2026. From 31 December 2029 that older timber has to meet Article 3 of the deforestation regulation like everything else.
Full answer — the grounds, the numbers, the pitfalls

So there is a three-year window in which two regimes run side by side over different stock, and the dividing line is the production date of the wood, not the date you bought it. Three consequences:

  • Know the production date of your timber. Before or after 29 June 2023 decides which regime the goods sit in until the end of 2029.
  • An EUTR due diligence system is not an EUDR one. The old regime asked about legality; the new one asks about legality and deforestation, with geolocation and a filed statement.
  • Small operators lose the extra six months for these goods. The later date of 30 June 2027 explicitly does not cover products that were in the Annex to Regulation (EU) No 995/2010.
Source: Regulation (EU) 2023/1115, Article 37 and Article 38(3), both as replaced by Regulation (EU) 2025/2650, Article 1, points (24) and (25). Checked: 5 September 2026.

What does a defensible file actually contain? Article 9

Per relevant product, kept for five years: the description including trade name and, for wood, the common and full scientific name of the species; the quantity in kilograms net mass with the supplementary unit where one applies; the country of production; the geolocation of all plots with the production date or time range; who supplied you and who you supplied; and conclusive, verifiable evidence both that the goods are deforestation-free and that they were produced in accordance with the law of the country of production.
Full answer — the grounds, the numbers, the pitfalls

“Adequately conclusive and verifiable” is the phrase that decides audits, and it is doing real work. A supplier declaration that repeats the requirement back to you is neither conclusive nor verifiable. What tends to satisfy it:

  • Documents from the country of production: land titles or use rights, harvest permits, tax and export records; the things a competent authority could check with the issuing body.
  • Independent observation: satellite or aerial analysis of the plots against the 31 December 2020 baseline, with the method and the date recorded.
  • A chain that reconciles: the quantity from those plots has to be capable of producing the quantity in your consignment. Volume reconciliation is where mixed and laundered lots fall over.

Certification schemes can be evidence in this file. They are not a substitute for it: the regulation puts the responsibility on the operator who submits the statement, and no scheme takes that over.

Source: Regulation (EU) 2023/1115, Article 9(1) and (2), with Article 9(1), point (b) as replaced by Regulation (EU) 2025/2650, Article 1, point (8); Articles 10 and 11 on risk assessment and risk mitigation. Checked: 5 September 2026.

Who can do this for me? we do not list any yet

This site does not yet carry a provider list for deforestation due diligence, and we would rather say so than send you to a page that does not have one. The providers we do map cover product safety, chemicals and waste shipments. What follows is what to ask a provider for this regime, so the comparison is yours rather than theirs.
Full answer — the grounds, the numbers, the pitfalls

Seven questions that separate a supply-chain due diligence provider from a certificate seller:

  • Do you collect geolocation from my suppliers, or do you process what I collect? These are different services at very different prices, and the first is the one that takes months.
  • Do you submit the due diligence statement in my name, and under what mandate? An authorised representative may submit on the operator's behalf under Article 6, but the operator keeps responsibility for compliance.
  • How do you test the plots against 31 December 2020, and can I see the method?
  • How do you handle volume reconciliation for mixed lots?
  • What do I get if a competent authority checks me? Ask for the file, not a certificate.
  • Who pays if the statement is wrong? Read that clause before the price.

If you want us to build the list, say so; we add sectors where we can verify what each provider publishes about itself, and not before.

Source: Editorial. Article 6 of Regulation (EU) 2023/1115, as replaced by Regulation (EU) 2025/2650, on authorised representatives. Checked: 5 September 2026.

The Annex I codes, searchable

Whether the regulation reaches your goods is decided by the product list in Annex I, by HS code. Here it is in full, as amended in December 2025. Type a code or a word such as leather, tyres or plywood.


HS codeCommodityWhat it covers
0102 21, 0102 29CattleLive cattle
ex 0201CattleMeat of cattle, fresh or chilled
ex 0202CattleMeat of cattle, frozen
ex 0206 10CattleEdible offal of cattle, fresh or chilled
ex 0206 22CattleEdible cattle livers, frozen
ex 0206 29CattleEdible cattle offal other than tongues and livers, frozen
ex 1602 50CattleOther prepared or preserved meat, meat offal or blood, of cattle
ex 4101CattleRaw hides and skins of cattle, not tanned
ex 4104CattleTanned or crust hides and skins of cattle, without hair on
ex 4107CattleLeather of cattle, further prepared after tanning or crusting
1801CocoaCocoa beans, whole or broken, raw or roasted
1802CocoaCocoa shells, husks, skins and other cocoa waste
1803CocoaCocoa paste, whether or not defatted
1804CocoaCocoa butter, fat and oil
1805CocoaCocoa powder, without added sugar or other sweetening matter
1806CocoaChocolate and other food preparations containing cocoa
0901CoffeeCoffee, roasted or not, decaffeinated or not; coffee husks and skins; coffee substitutes containing coffee
1207 10Oil palmPalm nuts and kernels
1511Oil palmPalm oil and its fractions, refined or not, but not chemically modified
1513 21Oil palmCrude palm kernel and babassu oil and fractions thereof
1513 29Oil palmPalm kernel and babassu oil and fractions, other than crude
2306 60Oil palmOilcake and other solid residues of palm nuts or kernels
ex 2905 45Oil palmGlycerol with a purity of 95 per cent or more on the dry product
2915 70Oil palmPalmitic acid, stearic acid, their salts and esters
2915 90Oil palmOther saturated acyclic monocarboxylic acids, their anhydrides, halides, peroxides and derivatives
3823 11Oil palmStearic acid, industrial
3823 12Oil palmOleic acid, industrial
3823 19Oil palmIndustrial monocarboxylic fatty acids; acid oils from refining
3823 70Oil palmIndustrial fatty alcohols
4001RubberNatural rubber, balata, gutta-percha, guayule, chicle and similar natural gums
ex 4005RubberCompounded rubber, unvulcanised, in primary forms or in plates, sheets or strip
ex 4006RubberUnvulcanised rubber in other forms, and articles of unvulcanised rubber
ex 4007RubberVulcanised rubber thread and cord
ex 4008RubberPlates, sheets, strips, rods and profile shapes of vulcanised rubber other than hard rubber
ex 4010RubberConveyor or transmission belts or belting, of vulcanised rubber
ex 4011RubberNew pneumatic tyres, of rubber
ex 4012RubberRetreaded or used pneumatic tyres; solid or cushion tyres, treads and flaps
ex 4013RubberInner tubes, of rubber
ex 4015RubberArticles of apparel and clothing accessories, including gloves, of vulcanised rubber
ex 4016RubberOther articles of vulcanised rubber other than hard rubber
ex 4017RubberHard rubber in all forms, including waste and scrap, and articles of hard rubber
1201SoyaSoya beans, whether or not broken
1208 10SoyaSoya bean flour and meal
1507SoyaSoya-bean oil and its fractions, refined or not, but not chemically modified
2304SoyaOilcake and other solid residues from the extraction of soya-bean oil
4401WoodFuel wood; wood in chips or particles; sawdust and wood waste and scrap
4402WoodWood charcoal, including shell or nut charcoal
4403WoodWood in the rough, whether or not stripped of bark or sapwood, or roughly squared
4404WoodHoopwood; split poles; piles, pickets and stakes; wooden sticks; chipwood and the like
4405WoodWood wool; wood flour
4406WoodRailway or tramway sleepers (cross-ties) of wood
4407WoodWood sawn or chipped lengthwise, sliced or peeled, of a thickness exceeding 6 mm
4408WoodSheets for veneering, for plywood or similar laminated wood, of a thickness not exceeding 6 mm
4409WoodWood continuously shaped along any edge, end or face, including parquet strips
4410WoodParticle board, oriented strand board (OSB) and similar board of wood or other ligneous materials
4411WoodFibreboard of wood or other ligneous materials
4412WoodPlywood, veneered panels and similar laminated wood
4413WoodDensified wood, in blocks, plates, strips or profile shapes
4414WoodWooden frames for paintings, photographs, mirrors or similar objects
4415WoodPacking cases, boxes, crates, drums, cable-drums, pallets, box pallets and pallet collars, of wood
4416WoodCasks, barrels, vats, tubs and other coopers' products of wood, including staves
4417WoodTools, tool bodies and handles, broom or brush bodies and handles, boot or shoe lasts, of wood
4418WoodBuilders' joinery and carpentry of wood, including assembled flooring panels, shingles and shakes
4419WoodTableware and kitchenware, of wood
4420WoodWood marquetry and inlaid wood; caskets and cases; statuettes and other ornaments of wood
4421WoodOther articles of wood
47 and 48WoodPulp and paper of Chapters 47 and 48, except bamboo-based and recovered (waste and scrap) products
ex 9401WoodSeats other than those of heading 9402, and parts thereof, of wood
9403 30, 9403 40, 9403 50, 9403 60, 9403 91WoodWooden furniture and parts thereof
9406 10WoodPrefabricated buildings of wood

ex before a code means only the part of that heading that contains or was made using the relevant commodity. The printed-matter line (ex 49) was deleted by Regulation (EU) 2025/2650 and is not in this table.

Source: Regulation (EU) 2023/1115, Annex I, as amended by Regulation (EU) 2025/2650, Article 1, point (26). Transcribed from the consolidated text. Checked: 5 September 2026.

The dates that matter

DateWhat happensWhere it says so
31 December 2020The cut-off date. A relevant commodity is deforestation-free only if it was produced on land that has not been subject to deforestation after this date; for wood, if the wood was harvested without inducing forest degradation after this date.Article 2, point (13)
29 June 2023The regulation entered into force. Timber produced before this date keeps a separate treatment under the old timber regulation.Articles 37 and 38
22 May 2025The country benchmarking list was adopted: 140 low-risk countries, 4 high-risk, everything else standard.Implementing Regulation (EU) 2025/1093
31 December 2024The cut-off for the small-operator date: only operators established as a natural person or a micro or small undertaking by this date get the later application date.Article 38(3)
30 April 2026The Commission is to carry out a simplification review of the regulation and report, with a legislative proposal where appropriate.Article 34(1a)
30 December 2026The main obligations apply: Articles 3 to 13, 16 to 24, 26, 31 and 32. On the same day the old timber regulation, Regulation (EU) No 995/2010, is repealed.Articles 37(1) and 38(2)
30 June 2027The later date for operators that are natural persons or micro or small undertakings established as such by 31 December 2024, except for products that were covered by the Annex to Regulation (EU) No 995/2010.Article 38(3)
30 December 2027The products added to Annex I by Commission Delegated Regulation (EU) 2026/2102 (soluble coffee, certain palm oil derivatives, frozen cattle tongues) become subject to the regulation.Annex I as amended by Commission Delegated Regulation (EU) 2026/2102; Article 34(1)
31 December 2029Regulation (EU) No 995/2010 stops applying to timber produced before 29 June 2023 that was placed on the market from 30 December 2026.Article 37(2) and (3)
30 June 2030First general review of the regulation, then at least every five years.Article 34(2)

These sit alongside the rest of what applies to importers in the compliance calendar.

Source: Regulation (EU) 2023/1115, Articles 2, 34, 37 and 38, as amended by Regulation (EU) 2025/2650; Commission Implementing Regulation (EU) 2025/1093. Checked: 5 September 2026.

Next steps

Start with the coordinates, not the paperwork. Write to every supplier of a relevant commodity now and ask for the plot geolocation and the production date or time range, per lot, with polygons for plots over four hectares. This is the only part of the regulation that depends on someone else's records, and it is the part that has no shortcut. Everything else you can do in a week; this takes a season.

Settle your role in writing. Operator, downstream operator or trader decides whether you file a due diligence statement at all, and it changed in December 2025. Put the answer per product line in your own file, with the reason, before December 2026 rather than during a check.

Get into the information system early and file a test statement. Register, walk one real consignment through it, and find out what your data does not contain while there is still time to ask for it. Non-SME downstream operators and traders have to register there too, even though they file nothing.

Wire the reference number into your customs process. It has to reach customs before release for free circulation or export. Tell your broker now which field it lands in; a statement filed correctly but too late for the declaration still stops the container.

Put it in the contracts you sign this year. Deliveries in 2027 are being priced now. A purchase contract without a geolocation clause, an EUDR warranty and a right to reject on missing data leaves the risk with you and the margin with your supplier.

Other regimes that usually land on the same shipment: waste shipments if there are residues, CBAM if there is steel or aluminium in the packaging or the equipment, and GPSR if any of it reaches a consumer. Not sure which apply? Seven questions name every regime that lands on your situation.

Check it yourself, at the source

Every answer above names the regulation and the article; the number links straight to the consolidated text on EUR-Lex. These are the official portals behind this page, each one checked on the date in the answers above.